callBack Request a callback
Otta
On site
On site

189 900 € + VAT

Dimensions: 121 m²
Construction time: 6 months
Otta
House
specifications
plus
Frame of impregnated C24 pine
plus
PAROC Ultra insulation (0.035 W/mK): 250 mm walls, 350 mm ceilings
plus
Siga and Rothoblaas wind, vapour barrier and roof membranes
plus
VEKA Softline 76 triple-glazed PVC windows and doors, anthracite (RAL 7016)
plus
Standing-seam metal roof, anthracite (RAL 7016)
plus
Façade — factory-painted grade A spruce boards
plus
Floors — laminate (class 33) or vinyl
plus
Two bathrooms with Metroks tiles and underfloor heating
plus
Water pipes (Aquatherm, Pipelife), sewage and wiring in protective conduits
House customisation
Kitchen furniture & Appliances
Kitchen furniture & Appliances
7 Items | 10 000 €
remove
Add
remove
plus
IKEA furniture with LED lighting
plus
Sink
plus
Faucet
plus
Induction stove
plus
Dishwasher
plus
Refrigerator with a freezer/ Built-in refrigerator with a freezer
plus
Extractor hood
Bathroom appliances
Bathroom appliances
5 Items | 8 000 €
remove
Add
remove
plus
Sink with faucet (Hansgrohe)
plus
Built-in toilet (Grohe)
plus
Shower trap in the floor (ACO)
plus
Shower system (Hansgrohe)
plus
Boiler 80L (Ariston)
Heating
Heating
2 Items | 9 000 €
remove
Add
remove
plus
GREE heat pump with WI-FI (1 outdoor unit and 4 indoor units)
plus
Installation and materials
Foundation
Foundation
1 Items | 32 670 €
remove
Add
remove
plus
Insulated concrete slab
customization-house
base project price

189 900 € + VAT


Kitchen furniture & Appliances
+ 10 000 €
cancel

Bathroom appliances
+ 8 000 €
cancel

Heating
+ 9 000 €
cancel

Foundation
+ 32 670 €
cancel

total price

189 900 € + VAT

plus
Foundation — priced separately
Construction options
Completely
Completely
finished house
A fully finished house is a completed home that lacks furniture and appliances. All the walls are painted, floor finishes are installed, and the ceilings, electrical and plumbing fixtures, doors, and windows are in place
Prefabricated
Prefabricated
panels
When the panels are manufactured, they are loaded onto trucks according to a pre-planned transport/loading schedule. The loading plan is created based on the sequence of the building's assembly, ensuring that elements arrive on each truck exactly when they are needed.
Construction
Construction from
materials on site
The construction of the house takes place directly on the building site, which means that all the main structural elements are assembled and installed right on-site, rather than in factory conditions. The process involves the delivery of materials, which are then connected into a unified structure using specialized equipment and manual labor.
Payment stages
prefab prefab
panels panels
onSite
50%
Deposit to begin production when concluding a contract
smallArrow
20%
the buyers pays next part when the frame is ready
smallArrow
10%
when the windows are assembled
smallArrow
10%
after the exterior finish is ready
smallArrow
10%
when the entire house is finished
tick
50%
Deposit to begin production when concluding a contract
smallArrow
20%
the buyers pays next part when the frame is ready
smallArrow
10%
when the windows are assembled
smallArrow
10%
after the exterior finish is ready
smallArrow
10%
when the entire house is finished
tick
50%
Deposit to begin production when concluding a contract
smallArrow
20%
the buyers pays next part when the frame is ready
smallArrow
10%
when the windows are assembled
smallArrow
10%
after the exterior finish is ready
smallArrow
10%
when the entire house is finished
tick



Get in touch with our team for
personalised assistance
or
We inform you that the website uses cookies to improve the user experience and optimize its operation. More information!