callBack Request a callback
How it works?
We aim to simplify and inspire the entire process of bringing your dream house to your location. Here are the key steps that define the journey:

01.
Project selection
Explore our website to discover the house model that resonates with your vision, preferred size, design, and layout. Enhance your chosen home with additional features to create your ideal living space. Submit your customization requests to us!

02.
Consultation & production visit
Visit our office in Riga or arrange an online consultation with our team of experts and gather any necessary information. You are also invited to explore our production facilities and view our completed houses in Latvia for an in-person experience of our product.

03.
Contract & first payment
Once you have selected your ideal house and decided on any preferred additions, we proceed to sign the contract. At this stage, the client is required to make an initial payment of 50% of the total amount.

04.
Submission of documents to building authorities
Upon signing the agreement, we will provide you with all the requisite documents and plans necessary for submission to your local building authorities. We offer to adjust each house to your specific local requirements. This ensures a smooth and compliant process for obtaining the necessary approvals and permits for your project.

05.
Beginning of house construction
Construction of your house commences at our production facility. The timeframe for completion is contingent upon the size and design of your chosen home. Throughout the process, we maintain regular communication, providing updates on progress and the work accomplished at each stage.

06.
Selecting finishing materials
We understand the importance of creating a perfect house that aligns with your vision. To achieve this, we provide you with a wide range of options for finishing materials. You can choose from a variety of colors and styles for exterior and interior walls, flooring, roof, and windows to ensure that every detail matches your preferences and brings your dream home to life.

07.
Installation of foundation
While we are in the process of constructing your house, it is essential that you prepare the foundation at your site. You can use pillars, screw piles, concrete foundations, or other alternatives based on your preferences. We will provide all the necessary information, including a foundation plan and communication plan, to ensure that you can prepare the site effectively and choose the best option for your project.

08.
Delivery and installation
Once your house is complete, we are ready to ship it to your location. Advance organization of transportation is essential to ensure a smooth and successful delivery process. The method of shipment may vary based on the chosen house model and construction method. Whether it's delivered fully finished, in multiple modules, or panelized, it's important to note that crane services will be required both at our production facility and on your site.

09.
Connection to utilities
After the house is securely placed on its foundation and all necessary construction work is completed, which may include site-specific requirements, your final step is to connect your existing utilities to the prepared outputs within the house. These connections involve water, sewage, and electricity. After this, your new house will be ready for you to move in and enjoy!
Construction options
Completely
Completely
finished house
A fully finished house is a completed home that lacks furniture and appliances. All the walls are painted, floor finishes are installed, and the ceilings, electrical and plumbing fixtures, doors, and windows are in place
Prefabricated
Prefabricated
panels
When the panels are manufactured, they are loaded onto trucks according to a pre-planned transport/loading schedule. The loading plan is created based on the sequence of the building's assembly, ensuring that elements arrive on each truck exactly when they are needed.
Construction
Construction from
materials on site
The construction of the house takes place directly on the building site, which means that all the main structural elements are assembled and installed right on-site, rather than in factory conditions. The process involves the delivery of materials, which are then connected into a unified structure using specialized equipment and manual labor.
Payment stages
prefab prefab
panels panels
onSite
50%
Deposit to begin production when concluding a contract
smallArrow
20%
the buyers pays next part when the frame is ready
smallArrow
10%
when the windows are assembled
smallArrow
10%
after the exterior finish is ready
smallArrow
10%
when the entire house is finished
tick
50%
Deposit to begin production when concluding a contract
smallArrow
20%
the buyers pays next part when the frame is ready
smallArrow
10%
when the windows are assembled
smallArrow
10%
after the exterior finish is ready
smallArrow
10%
when the entire house is finished
tick
50%
Deposit to begin production when concluding a contract
smallArrow
20%
the buyers pays next part when the frame is ready
smallArrow
10%
when the windows are assembled
smallArrow
10%
after the exterior finish is ready
smallArrow
10%
when the entire house is finished
tick
Get in touch with our team for
personalised assistance
or
We inform you that the website uses cookies to improve the user experience and optimize its operation. More information!